St. Matthew's Church Elevator
Three sites have been investigated for the placing
of the elevator in our church:
1.The entrance to the Social Hall and Church off the parking
lot and entering the worship area through the door by the organ.
2.The main entrance of the Church and what is now known as the
Brides Room entering the Social Hall through what is now
the storage area behind the bar.
3.The main entrance of the Church and in what is now the storage
room off the sacristy, entering the Social Hall at the Robie
Street entrance.
Sites 2 and 3 appear to be the most cost efficient,
although they will demand some relocation of storage spaces
for parish uses.
The plan is to have the elevator installed in
the summer months and ready for operation by Labor Day. It takes
from 12-16 weeks for the elevator construction-in the meantime
the site will be prepared and readied for the elevator installation.
The ramp at the main entrance of the church will
have to be redesigned to meet state codes, and perhaps the wash
room off the sacristy will be enlarged to make it handicapped
accessible.
The cost of this piece of our project will be
between $125,00 and $150,000 depending on the extent of renovation.
This is more than the $100,000 that was originally projected.
The Saint Matthew Capital Campaign Transition
Team will be meeting to determine the work to be done to the
school building during the summer months.
I am grateful to all who have and continue to
support our Capital Campaign, and I am eager to see the work
begin!